| HOME | ABOUT US | SERVICES | EXPERIENCE | OPPORTUNITIES | CONTACT US |
EXPERIENCE |
|||
|
SIDEWALK REPAIRS AND SPECIFIC DECK REPAIRS AT TRIBOROUGH BRIDGE, NYC, NY |
|||
|
Project Title and Location: Sidewalk Repairs and Specific Deck
Repairs at Services: Condition
Preliminary/Final
Designs Contract documents Cost Estimates Construction
Schedule Project Completed: 1997 Client: Reference: Robert Kushmock, P.E. (718) 904-4346 |
The
1.
2.
3.
It also has 14 miles of approach roadway spans connecting three boroughs. .
The scope of work included replacement of bridge sidewalk, specific deck repairs, structural steel repairs, and flag repairs under project GFC-301. Contract plans also included maintenance and protection of traffic plans. Construction cost estimates and schedule were also prepared under this project.
|
||
|
© SIDDIQUI ENGINEERING 2003 |